Get a Free Quote

Our representative will contact you soon.
Email
Name
Whatsapp
Message
0/1000

Full Automatic 12000BPH Water Pet Bottle Washing Filling Capping Machine

Capacity:2000-24000BPH
Bottle Size:250ML-2000ML
Function:Washing Filling Capping

独立站详情页banner.png

Water Bottling Filling Line

**We supply complete solution for the water filling production line ,including bottle blowing machine/ CIP system/Water treatment system /Washing filling capping machine(blowing-filling-capping) /Automatic labeling machine / Date Printer/ Automatic packing machine /Automatic Palletizer system and so on

Technical Parameters

Model CGF14-12-4 CGF18-18-6 CGF24-24-8 CGF32-32-10 CGF40-40-12 CGF50-50-15
Rinsing Heads 14 18 24 32 40 50
Filling Heads 12 18 24 32 40 50
Capping Heads 4 6 8 10 12 15
Capacity(BPH) 4000 6000 10000 12000 18000 24000
Motor Power(KW) 2.2 3.5 4.5 6 7.5 9.5
Dimension(mm) 2100*1500*2200 2300*1700*2400 2800*2200*2400 2900*2200*2500 3600*2700*2852 5450*3300*2900
Weight(KG) 2000 2500 3500 5500 7500 9600

Configuration

Details For 12000BPH Water Filling Production Line
Recommend
ADVANCED
Water Treatment System
Water Treatment System
2 Sets 6000BPH Blowing Machine(One operational, one standby )
Full Automatic 12000BPH Blowing Machine(One Set)
Full Automatic Water Filling Machine
Full Automatic Water Filling Machine
Full Automatic Labeling Machine
Full Automatic Labeling Machine
Date Printer
Date Printer
Full Automatic Packaging Machine
Full Automatic Packaging Machine
800-1000 Square Meters
800-1000 Square Meter

Complete Line Solution

One Stage RO System(1).png

Water Treatment System
According to customer's water source analysis report and the final water standard required ,we will suggest customer to choose the suitable water treatment plants.help to reduce the material consumption and maitenance cost .

blowing machine.jpg

Bottle Blowing Machine
Automatic bottle blowing machine can be widely used to blow various calibers of hollow plastic containers, product quality is stable, the machine structure design is reasonable, with small volume less energy consumption, easy to operate, easy to maintain and so on.

32头水机.jpg

Water Washing Filling Capping Machine
This Water Filling Machine is used to produce polyester bottled mineral water, purified water, drinking water beverage machinery and other non-gas beverage machinery. This Water Filling Machine can finish all the process such as rinsing bottle, filling and sealing, it can reduce the materials and Outsiders touch time,improve the sanitary conditions,production capacity and economic efficiency.

labeling machine.jpg

Labeling Machine
The Labeling Machine from EQS Machinery is a state-of-the-art solution for fast, efficient, and accurate labeling of a wide variety of containers and packages. Designed to meet the demanding needs of modern production environments, this machine combines cutting-edge technology with robust engineering to deliver unparalleled performance and reliability.

packaging machine.jpg

Packaging Machine
We supply the different bottle package deisgn , Film package ,Carton box wrapper ,Film with tray package and so on ..

Turnkey Project

24000BPHwatercad.jpg

24000BPH Water Filling Production Line

1.Water Treatment System 2.Air Compressor Room 3.Water Blowing Filling Capping Machine 4.Laser Printer 5.Lamp Checker 6.Centralized Lubrication System 7.Bottle Dryer 8.Hot Glue Labeling Machine 9.Lamp Checker 10.Automatic Carton Machine 11.Inkjet Printer 12.Palletizer

Company

filling machine factory1.jpg

With over 20 years of industry experience, we have established ourselves as a leading provider of beverage production line solutions worldwide. Our state-of-the-art manufacturing facility spans over 50,000 square meters and is equipped with advanced machinery and technology.


We pride ourselves on our commitment to quality, innovation, and customer satisfaction. Our team of experienced engineers and technicians work closely with clients to understand their specific needs and deliver customized solutions that exceed expectations.

FAQ

Q1: What is the exact capacity of the CGF32-32-10 model?
The CGF32-32-10 delivers 12,000 BPH (bottles per hour) with 32 rinsing heads, 32 filling heads, and 10 capping heads. Motor power is 6 kW, machine dimensions are 2,900 × 2,200 × 2,500 mm, and weight is 5,500 kg. The full CGF Series ranges from 4,000 BPH (CGF14-12-4) to 24,000 BPH (CGF50-50-15).
Q2: What bottle sizes and materials are compatible?
The machine accommodates PET bottles from 250 mL to 2,000 mL. All product-contact components are made from 316L stainless steel. Custom tooling can be configured for non-standard bottle shapes or cap types upon request.
Q3: Does the machine meet food safety and international quality standards?
Yes. The CGF Series is CE certified and complies with ISO 22000 food safety management standards. The integrated CIP (Clean-In-Place) system enables in-place sanitation without disassembly, meeting international hygienic design requirements for bottled water production.
Q4: How do you verify machine quality before shipment?
We conduct a full factory acceptance test (FAT) and send you a recorded video of the machine running under production conditions before delivery. You are also welcome to send bottle samples for a trial filling run at our facility.
Q5: What is the warranty and after-sales support policy?
All CGF Series machines include a 15-month warranty covering manufacturing defects. Lifetime technical support is provided, including remote diagnosis, spare parts supply, and on-site engineering service when required.
Q6: Do you supply complete turnkey water bottling lines?
Yes. We supply the full production line including: water treatment system, air compressor room, bottle blowing machine, laser/inkjet printer, lamp inspection system, centralized lubrication, bottle dryer, labeling machine, automatic carton packer, and palletizer — fully integrated to your site layout. A reference 24,000 BPH turnkey project is detailed on this page.
Q7: How long does delivery and installation take?
Delivery time depends on the confirmed model and current production schedule. After arrival, our engineers travel to your facility for installation and commissioning. A standalone filling unit typically requires 3–5 days on-site; a full turnkey line requires 2–4 weeks. Operator training is included.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Whatsapp
Message
0/1000