wine.jpg

Wine

  • Project Description: 16 28-meter-high aisles, 16 double-deep stackers, storage capacity of 40,802 pallets; full-process box and pallet logistics system in the warehouse area of 7,630 square meters;
  • EQS Supply Scope: Stackers, racking, conveyors, WMS, WCS;
  • Implementation Period: Total period of 180 days, design and manufacturing of 60 days, on-site installation of 65 days, single-machine debugging of 35 days, joint debugging of 20 days;
  • Project Benefits: Space utilization increased by 70%, inventory and delivery efficiency increased from 170 pallets/hour to 370 pallets/hour, 13 in-plant logistics personnel reduced, and 31 warehouse operation personnel reduced.

Logistics Cold Chain.jpg

Logistics Cold Chain

  • Project Description: 10.2-meter-high four-directional trolley intensive storage (-25°C cold storage), 16 four-directional trolleys, storage capacity of 5,326 trays, warehouse area of 3,500 square meters;
  • Supply Scope Of EQS: Four-directional trolleys, racking, conveyors, WMS, WCS, AGI system, cross-belt sorter;
  • Implementation Period: Total period of 145 days, design and manufacturing of 50 days, on-site installation of 40 days, single-machine debugging of 20 days, joint debugging of 25 days;
  • Project Benefits: Space utilization increased by 20%, 13 in-plant logistics personnel reduced, and 46 warehouse operation personnel reduced (picking operation personnel).

New Energy Vehicles.jpg

New Energy Vehicles

  • Project Description: 12 independent and different functional 3D warehouses, each with 4 single-deep stackers, totaling 48 stackers, battery tray storage capacity of 6,784 trays, and warehouse area of 4,320 square meters;
  • EQS Supply Scope: 28 stackers for 7 warehouses, 7 warehouses' shelves, and an 8.4 kilometer conveying system for the whole process;
  • Implementation Cycle: Total period of 265 days, design and manufacturing of 80 days, on-site installation of 75 days, single machine debugging of 50 days, and joint debugging of 60 days;
  • Project Benefits: The space utilization rate has increased by 30%, and a total of 68 logistics personnel in the factory have been reduced.

Pharmaceutical.jpg

Pharmaceutical

  • Project Description: 8 21-meter-high aisles, 5 double-deep stacker cranes, 3 single-deep stacker cranes, storage capacity of 17,054 pallets, warehouse area of 4,160 square meters;
  • EQS Supply Scope: Stacker cranes, racking, conveyors, WMS, WCS;
  • Implementation Period: Total period of 165 days, design and manufacturing of 50 days, on-site installation of 60 days, single-machine debugging of 35 days, joint debugging of 20 days;
  • Project Benefits: Space utilization increased by 40%, inventory and delivery efficiency increased from 165 pallets/hour to 280 pallets/hour, 8 in-plant logistics personnel reduced, and 16 warehouse operation personnel reduced.

Beverages.jpg

Beverage

  • Project Description: 10 21-meter-high aisles, 8 double-deep stacker cranes, 2 single-deep stacker cranes, storage capacity of 21,048 pallets, warehouse area of 5,040 square meters;
  • EQS Supply Scope: Stacker cranes, racking, conveyors, WMS, WCS;
  • Implementation Period: Total period of 180 days, design and manufacturing of 60 days, on-site installation of 65 days, single-machine debugging of 35 days, joint debugging of 20 days;
  • Project Benefits: Space utilization increased by 50%, inventory and delivery efficiency increased from 150 pallets/hour to 320 pallets/hour, 11 in-plant logistics personnel reduced, and 25 warehouse operation personnel reduced.

furniture.jpg

Furniture

  • Project Description: 5 21-meter-high aisles, 5 single-deep stacker cranes, storage capacity of 7,990 large racks, and a warehouse area of 2,670 square meters;
  • EQS Supply Scope: Stacker cranes, racking, conveyors, RGV, hoists, IWMS, WCS;
  • Implementation Period: Total period of 160 days, design and manufacturing of 50 days, on-site installation of 60 days, single-machine debugging of 30 days, joint debugging of 20 days;
  • Project Benefits: Space utilization increased by 60%, inventory turnover rate from 130 trays/hour to 210 trays/hour, with a reduction of 13 logistics personnel in the factory and 16 warehouse operation personnel.

Company

filling machine factory1.jpg

With over 20 years of industry experience, we have established ourselves as a leading provider of beverage production line solutions worldwide. Our state-of-the-art manufacturing facility spans over 50,000 square meters and is equipped with advanced machinery and technology.


We pride ourselves on our commitment to quality, innovation, and customer satisfaction. Our team of experienced engineers and technicians work closely with clients to understand their specific needs and deliver customized solutions that exceed expectations.

FAQ

Q1: Are you a trading company or a manufacturer?
A1: We are a manufacturer, we supply the factory price with good quality,our Engineer Team with over 20 year's experience,welcome to visit!
Q2.How can I know your machine has good quality?
A2:We will send the video of testing the machine working condition for you before delivery,so you can send us your bottle samples for a trial.
Q3:What's your guarantee or the warranty of the quality if we buy your machines?
A3: We offer you high quality machines with 15 months guarantee and supply life-long technical support.
Q4: When can I get my machine after I paid?
A4: The delivery time is based on the exact machine you confirmed.
Q5: How can I install my machine when it arrives?
A5: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.
Q6: How about the spare parts?
A6: After we deal down all the things, we will offer you a spare parts list for your reference.
Q7: How to join EQS and become an agent?
A7: We sincerely invite you to become our filling machine agent and jointly expand the market. By contacting us, submitting company information for qualification evaluation, and ultimately signing an agency agreement, you will receive comprehensive product training and market support.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Whatsapp
Message
0/1000